To compare an operator time needed for feeding a batch of 10 plates of organoids manually and with the machine, we measured the time needed for a person to feed 10 plates and compared this time with the time needed to set up the machine. For adding the media on days 1, 2, and 5, it takes approximately six minutes for 10 plates; for feeding organoids it takes approximately 11 minutes for 10 plates. To connect the tubing and prime a machine, it takes approximately 2.5 minutes of operator time. The robot work time is 3.5 minutes for adding and 6.5 minutes for feeding. As a result, for 10 plates in a course of 25 days, it requires 34 minutes of operator time for automated culture and 117 minutes for manual cell culture. Furthermore, operator time does not change in case of the scaling up the protocol, whereas with manual culture, the time requirement increases proportionally.